EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

Pennyfield Lock Area Closed Today as Sliplining Begins Ahead of Schedule

November 12, 2026
Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this morning. As a result the temporary closure in the Pennyfield Lock area where construction is taking place began one day earlier than the Friday, November 13, start we announced yesterday. That means, the C & O Canal National Historical Park at Pennyfield Lock (Lock 22), the Montgomery Parks Pennyfield Lock Neighborhood Conservation Area, and the boat ramp are closed as of today. 

We know many people use this area, and apologize for the delay in notifying the public before the closure took effect this morning.

Starting sliplining sooner helps us move closer to completing this permanent repair and protecting the Potomac River, nearby communities, and the region's drinking water supply.

What to Expect
  • Closure dates: The closure began today, Thursday, November 12, and may remain in effect through Sunday, November 22, weather permitting.
  • Closed areas: Pennyfield Lock (Lock 22), the Pennyfield Lock Neighborhood Conservation Area and boat ramp, and the parking lots at Lock 22 and near the boat ramp.
  • Towpath: The C & O Canal towpath remains open, but the public will not be able to enter or exit the towpath through Pennyfield Lock or the Neighborhood Conservation Area.
  • Pennyfield Lock Road: Access is limited to residents and local traffic only to allow for staging, equipment, and construction vehicles.
  • Alternate access: The nearest access points to the towpath and the river are Violet's Lock (Lock 23) and Swains Lock (Lock 21).
Why Is the Area Closing?

DC Water is repairing about 1,700 feet of a 60-inch-diameter section of the Potomac Interceptor using a method called sliplining. Crews install new pipe sections inside the old one, creating a new, stronger pipe without having to dig up and replace the existing sewer line. The work requires heavy equipment and very large pipe sections to be moved and staged throughout the work area. Keeping the public out of the site is essential for everyone's safety.

Stay Informed

We appreciate the community's patience and understanding. For project updates, visit dcwater.com/potomacinterceptor.

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.