EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

New Path for Capital Crescent Trail Opens at Georgetown Waterfront Park

January 16, 2026
Picture of new bike pedestrian path and traffic detour

If you bike, drive, or walk through Georgetown, we’ve got changes starting this week around the Potomac River Tunnel construction on Water Street NW. The Capital Crescent Trail has a new temporary detour through Georgetown Waterfront Park, open now for cyclists between 33rd and Potomac streets NW. The new path helps pedestrians and cyclists safely bypass the Potomac River Tunnel construction area. While Water Street remains open for vehicles, drivers should watch out for increased bike traffic and follow posted signs.

To access the Capital Crescent Trail, pedestrians are being redirected to the riverfront path between 34th Street and Cecil Place. Detour signs are posted to help everyone find their way. As crews continue work, we’ll continue to monitor traffic and trail use for any needed changes.

Construction for the Potomac River Tunnel Project at the Georgetown Waterfront Park is expected to wrap up by 2030.

What You Need to Know

When: January 2026 – 2030 

Where: 3300 block of Water St NW, between 33rd St and Potomac St 

Pedestrian Detours: 

  • Georgetown Waterfront Park: Use the path near the Potomac River between 34th St and Cecil Pl. Water Street:
  • If you're walking near the construction site, cross to the north side of Water St between 33rd and Potomac streets. 

Cyclist Detours: 

  • Cyclists should follow the new temporary path through Georgetown Waterfront Park between 33rd and Potomac streets. Stay alert for any changes and follow all posted detour signs. 

Drivers: 

  • Water St remains open but drivers should expect more bicycle activity. Please drive carefully and share the road.

For updates, check posted signs in the area or visit the Potomac River Tunnel page on dcwater.com.

Map of traffic pattern changes
Map: Follow the green arrows for the temporary bike path entering Georgetown Waterfront Park. Blue arrows indicate pedestrian detours. 

Project Details

DC Water is constructing the Potomac River Tunnel system to capture combined stormwater and sewer overflows and redirect them to the Blue Plains Advanced Wastewater Treatment Plant. As part of the project, an underground facility is being constructed at the Georgetown Waterfront Park site to connect the discharge pipe to the tunnel, to divert overflows from entering the river. When complete in 2030, the tunnel will reduce the amount of combined overflows to the Potomac by 93%, and the number of times this happens from about 74 to just four in a typical year, complying with a 2005 Federal Consent Decree entered by DC Water, the District of Columbia, the US Environmental Protection Agency, and the US Department of Justice and amended in January 2016. Learn more at dcwater.com/prt.

Contact Us

Project Email: dcpotomacrivertunnel@dcwater.com

Project Hotline: 202-972-1388

DC Water 24-hour Emergency: 202-612-3400

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.