EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

“Fix a Leak Week” is March 15-21

March 11, 2010

(Washington, DC) – Minor water leaks account for more than 1 trillion gallons of water wasted each year in American households. The District of Columbia Water and Sewer Authority (DC WASA) will remind its customers to improve their water efficiency by finding and fixing leaks during “Fix a Leak Week,” March 15-21, 2010. Fix a Leak Week is sponsored by the U.S. Environmental Protection Agency’s (EPA’s) WaterSense® program.

“In today’s economy, our customers want to save money on their bills. Fixing household leaks is a great way to save water and money too,” said DC WASA General Manager George S. Hawkins. “We’re excited about our first Fix a Leak Week because water is a life-giving resource that shouldn’t be wasted, and DC WASA is happy to help conserve it.”

On Monday, March 15, DC WASA will kick off Fix a Leak Week with a water- conservation event at the Frank W. Reeves Municipal Center, 2000 14th Street, NW. From 10:00 a.m. to 2:00 p.m., DC WASA representatives will distribute water-saving information and demonstrate how to install water-efficient plumbing fixtures. DC WASA’s Wayne the Waterdrop character will also make a special appearance.

During the week, consumers can visit our website, www.dcwasa.com, and Facebook page, www.facebook.com/dcwasa, for useful water-saving tips and to learn more about WaterSense labeled products. These products use about 20 percent less water and perform at least as well as standard models. Most common leaks can be eliminated by retrofitting homes with WaterSense labeled fixtures and other high-efficient appliances.

About The District of Columbia Water and Sewer Authority
The District of Columbia Water and Sewer Authority (DC WASA), is an industry leading multi-jurisdictional regional utility that provides drinking water, wastewater collection and treatment to more 600,000 residential, commercial and governmental customers in the District of Columbia, and also collects and treats wastewater for 1.6 million customers in Montgomery and Prince Georges counties in Maryland and Fairfax and Loudoun counties in Virginia. DC WASA’s service area covers approximately 725 square miles and the company operates the world’s largest advanced wastewater treatment plant with a capacity of 370 million gallons per day and has a peak capacity of 1.076 billion gallons per day.

###

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.