EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

District of Columbia Water and Sewer Authority Board Trims Proposed Rate Increase

September 09, 2005

WASA Board Chairman Glenn S. Gerstell today announced that the Board of Directors approved a water and sewer rate increase of 5.5 percent at its September 1, 2005 Board meeting, which is less than the six percent increase originally proposed by WASA management.

Rate increases are needed to cover the cost of a ten-year, $2.1 billion capital improvements program to improve water and sewer services and pumping and treatment facilities, and to reduce combined sewer overflows into District waterways. Despite the increase in rates, WASA’s services continue to be priced competitively with other large East Coast utilities.

“Funds generated by the rate increase will be devoted to improving our water and sewer infrastructure – replacing lead service lines and old water mains, valves and sewers – some of which have been in the ground for over a century,” said Chairman Gerstell. “So as not to unduly burden our customers, the Board adheres to a policy of gradual and predictable rate increases.”

The rate increase will take effect with the first billing in October, the beginning of WASA’s new fiscal year (FY2006). For the typical residential customer, this will result in an increase of approximately $2.08 per month, based on an average monthly usage of 6,231 gallons of water. In addition, the District’s Right of Way/Payment in Lieu of Taxes (PILOT) fee has increased by about $.50 per month for customers. These fees are charged by the District of Columbia government to WASA, and are passed through as a separate line item on the customer’s bill.

The proposed rate increases were advertised extensively and discussed with residents at a number of public hearings and community meetings. “For more than a decade before WASA was established, there was disinvestment in the water and sewer systems. Virtually no significant improvements were made,” Gerstell said. “Since WASA ‘s establishment in 1996, it has been dedicated to investing in a modern, efficient operation, fully capable of meeting federal regulations and the needs of our customers.”

WASA serves approximately 121,000 customers in the District of Columbia.

###

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.