EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

DC Water Investigating Sanitary Sewer Overflow from Potomac Interceptor in Maryland

January 19, 2026
Map of the impacted area.

WASHINGTON, DC — DC Water is investigating a Sanitary Sewer Overflow (SSO) from the Potomac Interceptor (PI) sewer line in C & O Canal National Historical Park in Montgomery County, Maryland. Flow was observed coming out of the PI this evening, and DC Water has mobilized its crews and contractors to mitigate the overflow and keep it contained as much as possible so they can assess the damage and begin repairs.

The damaged pipe is close to the Clara Barton Parkway, just east of the 495 interchange, and workers have closed the right inbound lane as a precaution. Drivers should anticipate delays during the morning rush hour and consider alternate routes. Trails and parking areas along the Parkway may also be impacted. 

The overflow is expected to reach the Potomac River. It is important to note that DC Water's drinking water system is separate from the wastewater system and is NOT affected by the overflow. The overflow is downstream from the Washington Aqueduct’s intakes at Great Falls.

The PI carries about 60 million gallons of wastewater daily from areas near Dulles Airport to the Potomac Pumping Station in the District. Flows from the pump station are then sent to the Blue Plains Advanced Wastewater Treatment Plant for treatment.

Untreated sewage can contain many pathogens causing a variety of illnesses ranging from E. coli to hepatitis. If people come in contact with the untreated overflow, they risk getting sick and bringing these pathogens into their homes; and should take the steps below:

  • Leave the area immediately.
  • Wash exposed skin thoroughly with soap and clean water.
  • Disinfect any affected areas or items.
  • Do not consume food or water that may have been exposed.
  • Seek medical attention if symptoms occur.
  • Report exposure to DC Water at (202) 612-3400.

Residents who live near the impacted area may notice an odor from the overflow. Emergency measures will be taken to prevent further spillage. The extent of the repairs and duration are still being determined. 

If you have additional questions or need information you may contact DC Water’s Customer Care team at (202) 354-3600 (Monday-Friday, 8 a.m. to 5 p.m.) or the 24-Hour Command Center at 202-612-3400.

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.