EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

DC Water and the University of Innsbruck Collaborate for Next Gen Wastewater Treatment Technology;

May 31, 2016

The University of Innsbruck and DC Water today announced a partnership to refine and market their next gen wastewater treatment technology, making advances to the first generation, the DEMON®-system, patented by the University and piloted at DC Water. It is a nitrogen removal process, addressing one of the most pressing issues facing the global water and wastewater industry in the 21st century—nutrient removal.

The DEMON-system is a biological and energy-efficient process that removes nitrogen from wastewater in an environmentally friendly way. Nitrogen can be harmful when discharged to waterways because it promotes algae growth that can deplete oxygen that fish and other aquatic life need to thrive. In fact, the Chesapeake Bay contains “dead zones” where nitrogen has caused algae blooms that block sunlight from reaching marine animals, fishes and plants.

To combat this problem, some, but not all, wastewater treatment plants convert the nitrogen compounds to nitrogen gas that is safely released into the atmosphere.

Traditional wastewater treatment technology uses microbes that require a highly oxygenated environment, and that feed on carbon, for this conversion. DEMON employs a microbe that was discovered in 1996 that requires less oxygen and carbon to perform this conversion, using 60 percent less energy and 90 percent less carbon. Since oxygenating treatment tanks consumes extremely large quantities of electricity, and the carbon food source, methanol, is the most expensive chemical for most plants, this can result in significant cost savings to any treatment plant.

This innovative technology has already been implemented in 70 wastewater treatments plants around the world and is now being further refined and marketed jointly with the University and DC Water. Improvements include the addition of screens for retaining the anammox bacteria, enabling the system to be fed continuously rather than starting and stopping while the settling process occurs. For new construction, this allows nitrogen loading rates to be increased significantly or the volume of new tanks to be reduced.

DC Water is currently building the world’s largest DEMON system at the Blue Plains Advanced Wastewater Treatment Plant. Similar systems are currently being planned and built in Stockholm, Singapore, Yokohama and Jerusalem.

Co-inventor of the DEMON process, Bernhard Wett, said, “This technology can be implemented in less space than conventional methods, significantly reducing construction costs and further benefiting wastewater plants that have maxed out their land use. We successfully implemented the first system in a wastewater treatment plant in Austria that became the first energy self-sufficient wastewater treatment plant globally. The partnership with DC Water will help other treatment plants cut costs and potentially reach this goal.”

Commenting on today’s announcement, DC Water CEO and General Manager George S. Hawkins, said, “The partnership with the University of Innsbruck to enhance and market this technology is another example of DC Water’s commitment to innovation that reduces operating costs, while also providing alternative revenue streams to lessen the burden of rate increases. Collaborating with successful and like-minded partners such as the University of Innsbruck, on promising opportunities, are a priority for DC Water.”

University of Innsbruck Rector Tillman Mark added, “The partnership with DC Water, a leading U.S. water utility with a reputation for innovation, will help develop the next generation in wastewater treatment and ultimately benefit wastewater treatment plants throughout the world.”

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.