EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

DC WASA Recognized for Efforts to Improve the Anacostia

April 21, 2009

“It’s amazing when you can do the right thing and get an award for it,” said DC Water and Sewer Authority (DC WASA) General Manager Jerry N. Johnson. The outgoing agency chief received a plaque from the Anacostia Watershed Society (AWS) acknowledging his leadership in reducing wet weather overflows in the Anacostia from the District’s combined sewer system.

The presentation was made by Col. Peter Mueller of the U.S. Army Corps of Engineers on Saturday April 18, 2009 during an Earth Day rally at Bladensburg Waterfront Park for the 15th Annual Anacostia River Clean Up & Earth Day Celebration.

The 176-square-mile Anacostia is a slow-moving waterway that begins in Maryland and flows through the District and into the Potomac River, a tributary feeding the Chesapeake Bay. DC WASA budgeted $196 million for improvements to a number of pumping stations and tide gates and for small sewer separation projects, all to reduce sewer overflows to the Anacostia by approximately 40 percent.

“Although we are extremely proud of this achievement, the road doesn’t stop there,” Johnson said. “The effort continues with a $2.2 billion DC WASA combined sewer overflow (CSO) program to reduce these wet weather discharges to the Anacostia by a total of 98 percent over the next 15 years. This is a commitment that we’ve made to correct a long-standing problem in the District of Columbia,” explained Johnson.

Also commenting, James Connolly, Executive Director for the Anacostia Watershed Society, said, “We are very pleased to have the opportunity to work with DC WASA on the retrofit of the District’s CSOs. Jerry Johnson has done a tremendous job to achieve the reduction to date and in leading the planning and groundwork for the remainder of the projects. These steps are dramatically improving the health of the Anacostia River.”

DC WASA also operates two skimmer boats that pick up approximately 400 tons of trash and debris annually from the District’s rivers. DC WASA is only one of several partners, including the District and Maryland, U.S. Army Corps of Engineers, AWS and a number of environmental organizations, working to make the Anacostia a better river.

“It’s this kind of partnership that gets things done,” said Johnson. “Let’s keep the ‘good fight’ going.” Saturday’s rally culminated a half-day Anacostia River cleanup, organized by AWS at 19 sites in the District and Maryland.

###
About The District of Columbia Water and Sewer Authority
The District of Columbia Water and Sewer Authority (DC WASA), is an industry-leading authority of the District government that provides drinking water, wastewater collection and treatment for a population of more than 500,000 in the District of Columbia. DC WASA treats wastewater for a population of 1.6 million in Montgomery and Prince Georges counties in Maryland, and Fairfax, and Loudoun counties in Virginia. The Authority operates the world’s largest advanced wastewater treatment plant with a capacity of 370 million gallons per day and a peak daily capacity of more than a billion gallons. DC WASA’s service area covers approximately 725 square miles.

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.