EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

DC WASA to Host Meeting on Combined Sewer Overflow Control Work along the Anacostia River

May 17, 2010

The District of Columbia Water and Sewer Authority (DC WASA) is undertaking an ambitious effort to control combined sewer overflows (CSOs) to the Anacostia and Potomac Rivers and Rock Creek. In conjunction with DC WASA’s continuing public outreach commitment to inform citizens and stakeholders and solicit their comments, an Environmental Assessment document is being prepared and a public meeting has been scheduled on:

Thursday, May 27, 2010
6:00 p.m. – 8:00 p.m.
Watkins Elementary School
420 12th St., SE
Metro Accessible via: Potomac Avenue Metro (Blue/Orange) or Metrobus: 32, 34, 36, A11

You may submit your verbal or written comments on the EA at the public meeting on Thursday, May 27, 2010. If you are unable to attend the public meeting, written comments may be submitted until June 14, 2010 via email at csotunnels@dcwasa.com, mailed to Nadia Perry-Lee, 5000 Overlook Avenue SW, Washington, DC 20032 or faxed to 202-787-2297.

You may also submit your comments on line by using the link listed below.

To view the Environmental Assessment document and additional information about the project and DC WASAs work click the link below.

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.