EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

Comment Period Extended for Potomac River Tunnel Environmental Assessment

November 13, 2018

Contacts:

Comment Period Extended for Potomac River Tunnel Environmental Assessment
Deadline for comments extended to December 4

WASHINGTON – Based on community feedback, DC Water and the National Park Service (NPS) are extending the deadline for comments on the Potomac River Tunnel Environmental Assessment (EA) to December 4, 2018.

DC Water is proposing to construct the Potomac River Tunnel in the District primarily on NPS land within Chesapeake and Ohio Canal National Historical Park, Rock Creek Park and National Mall and Memorial Parks. The EA is a required milestone before DC Water can finalize plans for how and where it will construct the associated infrastructure.

The project consists of a large-diameter deep sewer tunnel, diversion facilities, drop shafts and support structures to capture flows from existing combined sewer overflows along the Potomac River and transport them to the Blue Plains Advanced Wastewater Treatment Plan for treatment. The EA evaluates impacts based on a range of options for each facility proposed for construction, with a preferred option presented for each structure.

Attend an Open House
DC Water and the NPS invite the public to an open house public meeting to learn more about the project, the EA and to ask questions of project staff.

When: Wednesday, November 14, 2018, from 6 – 8 p.m.

Where: West End Library 2301 L St. NW, Washington, DC 20037

For more information or for individuals requiring special assistance at the open house, please contact DC Clean Rivers Project Public Outreach at (202) 787-4717, or by email at dccleanrivers@dcwater.com.

How to Comment
The preferred manner for providing comments is via an online form on the NPS Planning, Environment, and Public Comment (PEPC) website, used by the agency to manage official correspondence and analyze public comment in the planning process. From the project website.

Comments may also be submitted in writing to:

ATTN: Potomac River Tunnel EA
DC Clean Rivers Project
Blue Plains Advanced Wastewater Treatment Plant
5000 Overlook Avenue, SW
Washington, DC 20032

Comments must be provided electronically or postmarked by December 4, 2018, to receive consideration. Please be aware that the entire comment submitted – including personal identifying information such as address, phone number, and email address – may be made publicly available. Requests to withhold such personal identifying information from public release will be considered, but there is no guarantee that they will be withheld.

How to Obtain the EA
The EA can be downloaded from the NPS project webpage. Hard copies of the EA can also be found at the following District libraries:

Southwest Library, 900 Wesley Place SW
West End Library, 2301 L Street NW
Georgetown Library, 3260 R Street NW
Palisades Library, 4901 V Street NW

The DC Clean Rivers Project is DC Water’s ongoing program to reduce combined sewer overflows (CSOs) into the District's waterways - the Anacostia and Potomac Rivers and Rock Creek. The project is a massive infrastructure and support program designed to capture and clean water during heavy rainfalls before it ever reaches our rivers. Ultimately, it will improve water quality within the Chesapeake Bay watershed by lessening the volume of CSOs that enter the waterways. CSOs impair water quality by increasing water bacteria levels, contributing to low dissolved oxygen in water, increasing the potential for fish stress or fish kills and impacts to other aquatic life, and increasing the amount of trash in waterways. The proposed controls are estimated to reduce CSOs to the Potomac River by 93 percent by volume and limit their frequency from approximately 74 events to 4 events in a year of average rainfall.

Learn more at dcwater.com/cleanrivers.

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.