EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

Potomac Interceptor Sewer Reconstruction - Great Falls, Virginia

Potomac Interceptor Reconstruction Site - Great Falls, Virginia

Construction on the Potomac Interceptor, a major sewer line for the Washington region, is complete at the site near Potomac Heritage Trail in Great Falls, Virginia. Crews have completed the infrastructure improvements and restoration work, bringing the area back to its natural surroundings.

The Project Team worked closely with local partners including NOVA parks, and local government agencies, throughout construction to support project coordination, minimize impacts to the surrounding community, and ensure the successful completion of the work.

About the Project

This project focused on rehabilitating key segments of the Potomac Interceptor (PI), a critical part of the region’s sewer infrastructure. The work took place right next to our odor control facility at Great Falls and included reconstruction of a manhole that runs along the Potomac Heritage Trail.

The system carries about 60 million gallons of wastewater every day from communities near Washington Dulles International Airport all the way to the Potomac Pumping station in Washington, DC. From there, the water goes to the Blue Plains Advanced Wastewater Treatment Plant to be treated before being safely released into the Potomac River.

The system serves several communities, including Fairfax and Loudoun Counties, the towns of Vienna and Herndon, Dulles Airport, and Montgomery County, Maryland. DC Water is leading this important effort to make sure the system stays reliable for years to come.

Work Completed

  • Completed the transition of wastewater flow to the new pipes installed
  • Backfilled and secured all deep excavation areas
  • Removed construction equipment and cleared the site
  • Restored the natural environment
  • Repaved River Park Drive
  • Restored the Potomac Heritage Trail to its pre-construction conditions

Timeline

  • Design Started: May 2020
  • Construction Started: Spring 2022
  • Project Completed: Spring 2026
  • Work Hours: 6:00 AM – 4:30 PM, Monday through Friday

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.