Traffic Advisory: Road Restoration at New York Avenue and Bladensburg Road NE

November 28, 2025

Following the completion of priority valve repairs, DC Water will be doing road restoration work along New York Ave and Bladensburg Rd NE this weekend. The work will require lane closures for the duration of the weekend, reduce capacity, and may cause a significant impact to traffic.

DC Water is taking advantage of warmer temperatures this weekend to get the paving completed now, rather than implementing a temporary patch. The weekend-long lane closures are necessary to provide the 24 hours necessary for the concrete to set. The road restoration is the last step as part of an urgent project to replace three large water main valves in this area.

We recognize that lane closures are disruptive, and we appreciate your patience.

TRAFFIC INFORMATION

Where: New York Avenue NE & Bladensburg Road NE

When: Saturday, November 22nd 6 a.m. through Sunday, November 23rd 10 a.m.

Traffic impacts include:

  • Two eastbound lanes on New York Ave will be closed (west of Bladensburg Rd).
  • Eastbound New York Avenue will be reduced from three lanes to one, so expect delays.
  • Southbound Bladensburg Road will be closed (south of New York Ave).
  • No right turns from westbound New York Ave onto southbound Bladensburg Rd.
  • No left turns from eastbound New York Ave onto southbound Bladensburg Rd.
  • Follow posted detours or seek alternate routes.

Map of NY Ave and Bladensburg Rd NE

We apologize for the inconvenience and thank you for your understanding as we work to ensure reliable water service and restore the roadway.

Latest News

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Image of DC Water mascot Wendy with a child and the Lead Free DC Logo highlighting the Ward Wide Tour

First Stop Nov 19: Enjoy Free Giveaways and Live Music While Learning about LFDC

DC Water’s Lead Free DC (LFDC) Program is going on the road with a Ward Wide Tour. We’ll be spreading the word about replacing lead service lines with fun, festive community pop-up events making stops in all eight wards.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.