TRAFFIC ADVISORY: Overnight Lane Closures on M Street corridor in Georgetown for Valve Repairs

November 05, 2026
Photo of workers on M St doing repairs

On Thursday, November 5, beginning at 9 p.m., DC Water will be doing valve repair work involving lane closures and potential delays along M Street NW in Georgetown. Crews will replace one large valve and two small valves, continuing repairs that began Monday but were not completed because of unforeseen issues. The scheduled work and lane closures are expected to last eight hours, through 5 a.m. Friday, November 6.

Expect westbound lane closures and delays on M Street NW between 33rd and 36th streets during the overnight work.

WHEN AND WHAT TO EXPECT:

Date: Thursday night, November 5, through Friday morning, November 6, 2026

Time: 9 p.m. – 5 a.m.

Duration: Eight hours

Location: M Street NW between 33rd and 36th streets

TRAFFIC IMPACTS:

M Street NW: Expect westbound lane closures between 33rd and 36th streets NW.

Drivers, cyclists, and pedestrians should use caution near work zones and follow posted signs and directions from traffic control crews. Consider an alternate route and allow extra travel time.

Latest News

Workers in the excavation pit with the sliplining complete and the pipe sealed

Fourth and final repair at Pennyfield Lock is expected to be done next month

DC Water is nearing the finish line on emergency repairs to the Potomac Interceptor sewer line. DC Water and its contractors finished repairs along Clara Barton Parkway at the Maryland–DC border. It is the third of four emergency repairs identified earlier this year to be completed following a full inspection of the 54-mile sewer line.

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting
Date
December 22, 2026
Tuesday, 11:00 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.