Spring Cleaning for Water Distribution Pipes to Start March 21

March 15, 2011

WASHINGTON, DC – From March 21 through May 2, 2011, the disinfectant in drinking water will temporarily switch from chloramine to chlorine.

This annual change is part of a routine maintenance program to keep the water distribution system in the District of Columbia, Arlington County and Falls Church clean and free of potentially harmful bacteria. A temporary switch to chlorine with system-wide flushing is done to maintain water quality throughout the year. This is standard practice for many water systems that use chloramine during the majority of the year.

The Washington Aqueduct is the organization responsible for treating drinking water for the District of Columbia, Arlington County, and Falls Church, Virginia.

Individuals and business owners who take special precautions to remove chloramine from tap water, such as dialysis centers, medical facilities and aquatic pet owners, should continue to take the same precautions during the temporary switch to chlorine. Most methods for removing chloramine from tap water are effective in removing chlorine. Individuals with special health concerns should consult with a health care provider on the use of tap water.

During this time, individuals may notice a change in the taste and smell of drinking water. Local water authorities recommend running the cold water tap for approximately two minutes and refrigerating cold tap water for a few hours to reduce taste and odor. Water filters are also effective in reducing chlorine taste and odor. For more information, please contact the appropriate water authority below.

DC Water: 202-612-3440 (Monday-Friday, 8:00 a.m. - 4:30 p.m.) or 202-612-3400 (24-hour)

Arlington County: 703-228-6570 (Monday-Friday, 8:00 a.m. - 5:00 p.m.) or 703-228-6555 (24-hour)

Falls Church City: 703-248-5071 (Monday-Friday, 8:30 a.m. - 5:00 p.m.) or 703-248-5044 (24-hour)

Latest News

Workers in the excavation pit with the sliplining complete and the pipe sealed

Fourth and final repair at Pennyfield Lock is expected to be done next month

DC Water is nearing the finish line on emergency repairs to the Potomac Interceptor sewer line. DC Water and its contractors finished repairs along Clara Barton Parkway at the Maryland–DC border. It is the third of four emergency repairs identified earlier this year to be completed following a full inspection of the 54-mile sewer line.

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting
Date
December 22, 2026
Tuesday, 11:00 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.