Northeast Boundary Tunnel Construction Brings Lane Closures to Florida Avenue and 3rd Street Beginning March 10

March 07, 2014

(Washington, DC) – DC Water is performing construction activities on Florida Avenue, NW and 3rd Street, NW as part of the Northeast Boundary Tunnel (NEBT) portion of the Clean Rivers Project.

Beginning Monday, March 10, 2014 through Friday, March 28, 2014, weather permitting, crews will perform field investigation and survey work to assess the NEBT alignment. In preparation for the tunnel construction, DC Water will be conducting drilling and sampling of borings, and installing groundwater monitoring and sampling wells. Normal work hours will be from 7:00am to 7:00pm, Monday through Friday.

There will be lane closures on Florida Avenue and 3rd Street throughout this phase of the work. Closures will occur in one westbound lane on Florida Avenue at 4th Street, and also in one southbound lane on 3rd Street at Florida Avenue. All lane closures will be 24 hours.

Other Important Information:
* Traffic signs have been set up throughout the area to alert motorists to the upcoming traffic changes.
* Some traffic delays within the vicinity of the work zones are anticipated.
* Parking will be restricted within the work zone. Accordingly, “No Parking” signs will be posted 72 hours prior to the work, as required by the District Department of Transportation.
* Noise levels will be closely monitored during construction.

Project Details
DC Water is implementing the Clean Rivers Project which comprises a system of tunnels and diversion sewers for the capture of combined sewer overflows (CSOs) to Rock Creek and the Anacostia and Potomac rivers for treatment at DC Water’s Blue Plains Advanced Wastewater Treatment Plant. The entire project will reduce CSOs annually by 96 percent throughout the system and by 98 percent for the Anacostia River alone.

###

About DC Water
The District of Columbia Water and Sewer Authority (DC Water), is an industry leading multi-jurisdictional regional utility that provides drinking water, wastewater collection and treatment to 600,000 residential, commercial and governmental customers in the District of Columbia, 17.8 million annual visitors and also collects and treats wastewater for 1.6 million customers in Montgomery and Prince Georges counties in Maryland and Fairfax and Loudoun counties in Virginia.

DC Water’s service area covers approximately 725 square miles and the company operates the world’s largest advanced wastewater treatment plant with a capacity of 370 million gallons per day and a peak capacity of 1.076 billion gallons per day.

Latest News

Workers in the excavation pit with the sliplining complete and the pipe sealed

Fourth and final repair at Pennyfield Lock is expected to be done next month

DC Water is nearing the finish line on emergency repairs to the Potomac Interceptor sewer line. DC Water and its contractors finished repairs along Clara Barton Parkway at the Maryland–DC border. It is the third of four emergency repairs identified earlier this year to be completed following a full inspection of the 54-mile sewer line.

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting
Date
December 22, 2026
Tuesday, 11:00 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.