District of Columbia Residents: Your Tap Water Results

June 21, 2011

The District of Columbia Water and Sewer Authority (DC Water) has released its 2010 Drinking Water Quality Report, the most comprehensive drinking water resource delivered to District residents each year. The report provides valuable information about the water flowing from the Potomac River to taps throughout the city.

"Water is life, and in the nation’s capital, the job of supplying, reclaiming and recycling water belongs to DC Water," said DC Water General Manager George S. Hawkins. “I believe it is important for our customers to know where the water comes from, how it gets to their homes or businesses, and water monitoring results performed every year.”

Annually, DC Water conducts more than 30,000 water quality tests. The Drinking Water Quality Report provides information on regulated and unregulated contaminants and how our drinking water compares to federal standards. Most importantly, the report highlights monitoring results that ensure tap water is protective of the public’s health. DC Water mails a report to every household in the District.

Ensuring high-quality water is a shared responsibility of DC Water, residents, and the Washington Aqueduct (the federal agency responsible for treating the drinking water). DC Water maintains about 1,300 miles of pipe and distributes drinking water to more than 600,000 residents and businesses.

District tap water is safe, reliable and affordable, but water quality can vary among homes and buildings. The median age of water mains in the District is 77 years, and many residents are experiencing similar challenges with aging pipes in their households. Property owners are encouraged to learn about their plumbing and replace older pipes.

The 2010 Drinking Water Quality Report, monthly water quality testing results and tips to ensure household water quality are available at dcwater.com/waterquality or customers can contact the Drinking Water Division at (202) 612-3440.

Latest News

Workers in the excavation pit with the sliplining complete and the pipe sealed

Fourth and final repair at Pennyfield Lock is expected to be done next month

DC Water is nearing the finish line on emergency repairs to the Potomac Interceptor sewer line. DC Water and its contractors finished repairs along Clara Barton Parkway at the Maryland–DC border. It is the third of four emergency repairs identified earlier this year to be completed following a full inspection of the 54-mile sewer line.

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting
Date
December 22, 2026
Tuesday, 11:00 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.