DC Water’s George S. Hawkins awarded prestigious Fuller Award by the American Water Works Association

September 03, 2014

DC Water General Manager George S. Hawkins was awarded the prestigious George Warren Fuller Award by the Chesapeake section of the American Water Works Association (AWWA) during its annual meeting. The award recognizes Hawkins’ “exceptional and extraordinary” service and leadership to the water sector through a career of environmental and watershed protection.

The George Warren Fuller Awards are presented annually by the American Water Works Association for distinguished service to the water supply field in commemoration of the sound engineering skill, the brilliant diplomatic talent and the constructive leadership which characterized the life of George Warren Fuller.

General Manager Hawkins was recognized for exceptional service, citing a career in environmental protection and specifically in his leadership at DC Water. Since his arrival in 2009, DC Water has embarked on two massive engineering projects to protect the environment and a third that will generate power from wastewater using a technology new to North America. DC Water has also tripled its water main replacements and begun a sewer lining program that significantly reduces open trench replacement. Customer communication and transparency have been key, as DC Water has expanded its social media, community outreach and relationships throughout the District.

Commenting on the award, Mr. Hawkins said, “It is always a pleasure to be recognized for leadership in your field. I am proud of the work we are doing at DC Water— large-scale projects, research and innovation, maintaining aging infrastructure, and increasing customer communication. It is only because of the spectacular skill and experience of the people on the team, doing the work in the field, that I get accolades like this. I am incredibly humbled to be honored, because I feel honored to be part of the group that does this work.”

The awards ceremony was held August 28 at the Ocean City Convention Center in Ocean City, Maryland.

Latest News

Workers in the excavation pit with the sliplining complete and the pipe sealed

Fourth and final repair at Pennyfield Lock is expected to be done next month

DC Water is nearing the finish line on emergency repairs to the Potomac Interceptor sewer line. DC Water and its contractors finished repairs along Clara Barton Parkway at the Maryland–DC border. It is the third of four emergency repairs identified earlier this year to be completed following a full inspection of the 54-mile sewer line.

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting
Date
December 22, 2026
Tuesday, 11:00 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.