DC Water Taste Test Challenge Series: Tap Water versus Bottled Water

August 21, 2012

Can you tell a difference between tap water and bottled water? Test your drinking water preferences and learn how you can save money and the environment by choosing clean, affordable DC tap water.

DC Water is promoting tap water, protecting the environment and saving people money. Hundreds of water samples are tested each week throughout the District to ensure the delivery of high quality tap water. Bottled water involves significant economic and environmental costs. DC tap water is only a penny per gallon and bottled water costs 100 times more.

Join DC Water during a series of blind taste tests that will challenge people’s knowledge about tap water. Taste test challenges are scheduled in each Ward of the District.

Who:
DC Water Team Blue

When:
Every Wednesday between August 22 – October 10, 2012
11 a.m. to 1 p.m. (weather permitting)

Where:
Ward 1 – October 10, 2012
Columbia Heights Metro
3030 14th Street, NW

Ward 2 – August 22, 2012
Sweetgreen
2221 I Street, NW

Ward 3 – August 29, 2012
Whole Foods (Tenley Circle)
4530 40th Street, NW

Ward 4 – September 5, 2012
Petworth Metro
3700 Georgia Avenue, NW

Ward 5 – September 12, 2012
Home Depot
901 Rhode Island Avenue, NE

Ward 6 – September 19, 2012
Southwest Waterfront
1100 4th Street, SW

Ward 7 – September 26, 2012
Penn-Branch Shopping Center
3220 Pennsylvania Avenue, SE

Ward 8 – October 3, 2012
Ward 8 Constituent Building
2100 Martin Luther King Jr. Avenue, SE

Latest News

Workers in the excavation pit with the sliplining complete and the pipe sealed

Fourth and final repair at Pennyfield Lock is expected to be done next month

DC Water is nearing the finish line on emergency repairs to the Potomac Interceptor sewer line. DC Water and its contractors finished repairs along Clara Barton Parkway at the Maryland–DC border. It is the third of four emergency repairs identified earlier this year to be completed following a full inspection of the 54-mile sewer line.

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting
Date
December 22, 2026
Tuesday, 11:00 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.