DC Water Promotes Water Awareness at Its Annual Children’s Festival

June 30, 2014

Washington, DC – The District of Columbia Water and Sewer Authority (DC Water) hosted its annual Children’s Water Drop Festival at John Burroughs Education Campus on June 19, 2014. Approximately 80 students participated in this free, outdoor environmental education program, exploring and investigating various aspects of water. This event was designed to provide students a hands-on opportunity to learn about their drinking water and raise awareness about environmental issues affecting our water resources.

Students participated in a variety of interactive games, activities and exhibits about the drinking water, water quality, water pollution, and the Anacostia watershed. Some of the learning stations included a mobile water conservation unit, water testing, recycling and water relays, and a video showing of “A Drop’s Life”, a brief animated cartoon explaining the Clean Rivers Project. In addition, students toured the mobile water quality lab, took group photos with DC Water’s mascot, Wendy the Water Drop, and painted water-themed murals.

“This festival gives our future environmentalists and conservationists an experiential learning opportunity to discuss our water resources and complex issues affecting the health of our waterways,” said DC Water General Manager George S. Hawkins. “By providing students a fun and engaging hands-on experience, we hope they will be inspired to protect and appreciate this precious resource.”

Following the event, students received gift bags filled with DC Water souvenirs. Giveaways included water bottles, pencils, lanyards, toothpaste rollers, and water quality refrigerator magnets. In addition, students received a sun visor for participating.

The Children’s Water Drop Festival is held annually and rotates to an elementary school in each ward. Next year, the event will be held at a Ward 4 school. DC Water has previously hosted this event in Wards 6, 7, and 8.

Latest News

Workers in the excavation pit with the sliplining complete and the pipe sealed

Fourth and final repair at Pennyfield Lock is expected to be done next month

DC Water is nearing the finish line on emergency repairs to the Potomac Interceptor sewer line. DC Water and its contractors finished repairs along Clara Barton Parkway at the Maryland–DC border. It is the third of four emergency repairs identified earlier this year to be completed following a full inspection of the 54-mile sewer line.

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting
Date
December 22, 2026
Tuesday, 11:00 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.