DC Water to participate in “PARK(ing) Day” to promote benefits of green infrastructure

September 17, 2014

DC Water joins the District Department of Transportation (DDOT) and numerous District organizations during national PARK(ing) Day this Friday as they turn metered parking spaces into mini-parks for the day. DC Water’s space will feature examples of green infrastructure that reduce stormwater runoff by promoting infiltration, thus keeping rainwater out of the District’s stormwater and sewer systems.

DC Water’s parking space near 1227 Wisconsin Avenue, NW—in front of the Apple store—will showcase native rain garden plants, green roof plantings, and pervious pavers. In addition to adding beauty for the day, it will serve an educational purpose, with a miniature three-dimensional model of a green roof system and literature highlighting the purpose and benefits of green infrastructure.

“DC Water is committed to the use of green infrastructure. The benefits are huge—reducing runoff to the stormwater and sewer systems, adding local, sustainable jobs in GI maintenance, reducing the heat island effect and creating a vibrant, green city,” said DC Water General Manager George S. Hawkins.

“Friday’s event is a great opportunity to celebrate the environmental benefits green infrastructure can have in the District,” added Carlton Ray, DC Water’s Director of the DC Clean Rivers Project. “Visitors to our parklet can learn more about how our Clean Rivers Project improves the health of the District’s waterways as well as what they can do on their property to manage stormwater.”

Launched in 2005 in San Francisco, California, the annual PARK(ing) Day event has spread to cities around the world, as residents and businesses create temporary parks in metered parking spaces. PARK(ing) Day is open to anyone seeking to sponsor a six-hour temporary park. The parks are limited to metered parking locations without time-of-day restrictions.

For more information about DC Water’s temporary park, please contact Pamela Mooring at 202-787-2089 or Pamela.Mooring@dcwater.com.

For more information about the District’s PARK(ing) Day, please visit ddot.dc.gov/page/parking-day.

Latest News

Workers in the excavation pit with the sliplining complete and the pipe sealed

Fourth and final repair at Pennyfield Lock is expected to be done next month

DC Water is nearing the finish line on emergency repairs to the Potomac Interceptor sewer line. DC Water and its contractors finished repairs along Clara Barton Parkway at the Maryland–DC border. It is the third of four emergency repairs identified earlier this year to be completed following a full inspection of the 54-mile sewer line.

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting
Date
December 22, 2026
Tuesday, 11:00 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.