DC Water Announces Fourth Annual Children’s Water Drop Festival

June 11, 2014

The District of Columbia Water and Sewer Authority (DC Water) is partnering with John Burroughs Education Campus, a Ward 5 STEM school, to co-host the agency’s fourth annual Children’s Water Drop Festival. At this free environmental education program, DC Water specialists will provide students with hands-on opportunities to learn about their water supply and environmental challenges. Each year, DC Water hosts the event to educate students on their water resources and increase awareness of the value of this vital life force.

WHAT: DC Water will offer a variety of interactive learning stations, exhibits and activities at the Children’s Water Drop Festival. Participating students will explore and learn about their watershed and ways to protect and preserve it.

WHEN: Due to inclement weather conditions, the event has been rescheduled for Thursday, June 19 from 1:00 – 2:30 p.m. (rain date)

WHERE: John Burroughs Education Campus,1820 Monroe Street, N.E., Washington, D.C. 20018

WHO: DC Water Community Outreach Team
DC Water’s mascot, Wendy the Waterdrop
Approximately 80 students

Latest News

Workers in the excavation pit with the sliplining complete and the pipe sealed

Fourth and final repair at Pennyfield Lock is expected to be done next month

DC Water is nearing the finish line on emergency repairs to the Potomac Interceptor sewer line. DC Water and its contractors finished repairs along Clara Barton Parkway at the Maryland–DC border. It is the third of four emergency repairs identified earlier this year to be completed following a full inspection of the 54-mile sewer line.

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting
Date
December 22, 2026
Tuesday, 11:00 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.