DC WASA to Host Public Hearing on Proposed Rate Increase

June 01, 2010

The District of Columbia Water and Sewer Authority (DC WASA) is hosting a Public Hearing to discuss proposed water and sewer rate increases on June 9, 2010 at 6:30 P.M. at the Washington Metropolitan Area Council of Governments, 777 North Capitol Street, NE (First Floor Training Room). If approved by the DC WASA Board of Directors, the new rates will become effective October 1, 2010.

The proposal would increase the water and sewer volumetric rate by $.77 per Ccf (or $1.03 per 1,000 gallons), increase the monthly Impervious Area Charge (IAC) from $2.20 to $3.45 per ERU and increase the monthly Customer Metering Fee in accordance with the meter size, (beginning at $3.86 per month for the standard 5/8” meter). If the Board approves these proposed rate adjustments in September 2010, the District’s Right-of-Way (ROW)/Payment In Lieu Of Taxes (PILOT) fee will increase from $0.43 per Ccf to $0.49 per Ccf. These fees are charged to DC WASA by the District government and are passed through as a separate line item on the DC WASA bill.

The current proposal includes a new Six – Tier IAC Residential Rate Structure that would replace the original methodology for residential customer charges with an ERU structure for residential charges based on a range of impervious surface quantity. Finally, the Board has proposed an expansion of the Customer Assistance Program to include the first 4 Ccfs of PILOT and ROW fees in addition to the existing discounts already available to eligible low income customers.

Under these proposed adjustments, the typical residential customer’s monthly bill would increase by approximately $8.66 per month and the typical customer enrolled in the CAP would see an increase of merely $2.52 a month (based on an average monthly usage of 6.69 Ccf or 5,004 gallons of water). The average total bill from DC WASA, including the District charges, would increase from $51.53 to $60.19.

Even with these rate increases, one gallon of DC WASA water costs about a penny.

For more information about DC WASA rates, please click the link below.

Latest News

Workers in the excavation pit with the sliplining complete and the pipe sealed

Fourth and final repair at Pennyfield Lock is expected to be done next month

DC Water is nearing the finish line on emergency repairs to the Potomac Interceptor sewer line. DC Water and its contractors finished repairs along Clara Barton Parkway at the Maryland–DC border. It is the third of four emergency repairs identified earlier this year to be completed following a full inspection of the 54-mile sewer line.

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting
Date
December 22, 2026
Tuesday, 11:00 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.