DC WASA Board Approves 2011 Budget, Funding Critical Infrastructure and Environmental Protection Projects

February 04, 2010

(WASHINGTON, DC) – The District of Columbia Water and Sewer Authority (DC WASA) Board of Directors has adopted a spending plan for Fiscal Year 2011, addressing critical infrastructure and environmental protection projects.

At its February 4 Board meeting, the Board approved a FY 2011 Operating Budget of $408.1 million and a 10-year Capital Budget of $3.8 billion. The Board also proposed a rate increase effective October 1, 2010. The average residential customer’s bill would increase from about $51.53 to $60.19, based on consumption of 6.69 Ccf, or 5,004 gallons. Even with this increase, DC WASA’s rates remain competitive regionally and nationally.

“Safe drinking water and environmentally responsible wastewater treatment are essential to public health, and providing for these services has become increasingly costly,” said DC WASA General Manager George S. Hawkins. “But we meet almost all of our expenses from our retail and wholesale customers, and those expenses continue to rise.”

Those expenses include major costs associated with aging infrastructure and immense projects mandated by the U.S. Environmental Protection Agency (U.S. EPA) for pollution control.

In light of tough economic times, the Board made every effort to minimize rate increases. DC WASA Board Chairman William M. Walker said, “This year, the Board took an unprecedented extra month before adopting the budget. We have looked at several budget scenarios, cut a number of costs, and taken steps to ensure the delivery of our critical services while minimizing the economic impact to our residential and wholesale customers.”

In addition to the major environmental projects, this year’s budget also paves the way for a one-percent replacement of aging water and sewer infrastructure per year.

“I have visited some of our recent water main breaks, and several of these involved pipes that were installed in the 1800s,” Hawkins added. “We need to replace pipes before they break, but even at this new, faster rate, it will take us 100 years to reach them all.”

More information on the FY 2011 DC WASA budget is available on the accompanying fact sheet or at http://www.dcwasa.com/budget.

Latest News

Workers in the excavation pit with the sliplining complete and the pipe sealed

Fourth and final repair at Pennyfield Lock is expected to be done next month

DC Water is nearing the finish line on emergency repairs to the Potomac Interceptor sewer line. DC Water and its contractors finished repairs along Clara Barton Parkway at the Maryland–DC border. It is the third of four emergency repairs identified earlier this year to be completed following a full inspection of the 54-mile sewer line.

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m. - 1 p.m. while tree removal equipment is delivered to DC Water’s Park Road construction site ...

Workers inside the pit pushing in the new pipe section at Pennyfield Lock
Update

Work on the Potomac Interceptor at Pennyfield Lock is moving faster than expected. Crews were able to make significant progess, finishing preparationg work to begin the permanent repair this ...

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting
Date
December 22, 2026
Tuesday, 11:00 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.