National Park Service approves DC Water’s Soapstone Valley Park Sewer Rehabilitation Project

May 08, 2020

WASHINGTON, DC – The National Park Service (NPS) has completed an Environmental Assessment (EA) and approved DC Water’s proposed Soapstone Valley Park Sewer Rehabilitation Project. Soapstone Valley Park is managed by Rock Creek Park and is located southeast of the intersection of Connecticut Avenue NW and Albemarle Street NW, extending to Broad Branch Road NW.

DC Water has determined that the Soapstone Valley Park sanitary sewer system has exceeded its design life and is in need of rehabilitation. Through this project, DC Water will rehabilitate aging sewer infrastructure within Soapstone Valley Park while limiting disturbances to park resources.

The EA described a No Action Alternative and a Trenchless Alternative (DC Water’s Preferred Alternative) for the proposed project and identified and evaluated the impacts on natural and historic resources from implementing these alternatives. The NPS has selected the Trenchless Alternative for the project.

The proposed project will involve the following:

  • Clean, line, and repair approximately 6,200 linear feet of sanitary sewer pipe.
  • Reduce stream and groundwater infiltration and reduce potential for sewer overflows.
  • Protect exposed pipes and manholes along the creek.
  • Repair stormwater outfalls that are part of the Municipal Separate Storm Sewer System (MS4) outlet.

DC Water will move forward with final design and anticipates construction will start in the winter of 2021/2022.

To ensure public safety, sections of Soapstone Valley Park will be closed to visitors throughout the project.

The project will require the removal or trimming of several hundred trees in Soapstone Valley Park. DC Water and Rock Creek Park are committed to replanting trees after completion of the project. All off-trail areas impacted by the project will be closed for two years to allow growth of newly planted trees.

The NPS Acting Director, Region 1 - National Capital Area signed a Finding of No Significant Impact (FONSI) for the Soapstone Valley Park Sewer Rehabilitation Project EA on April 14, 2020. The FONSI and EA are available online at https://parkplanning.nps.gov/projectHome.cfm?projectID=47855.

Media Contacts:

​DC Water: Pamela Mooring, Pamela.Mooring@dcwater.com, 202-538-2773
National Park Service: Katie Liming, katelyn_liming@nps.gov, 703-399-4547

Latest News

Canal Rd slope showing areas with fallen rock

Off-Peak Lane Closures and Sidewalk Closure Begin This Week

Starting, Saturday, September 20, DC Water will begin construction to stabilize the slope on Canal Road NW between Foxhall Road (Glover-Archbold Trailhead) and the Georgetown University (GU) entrance.

Photo of completed repair with concrete encasing the sewr pipe

DC Water has successfully completed emergency repairs on a critical section of the Anacostia Force Main following a failure near Anacostia Avenue and Ponds Street Northeast in July. With repairs finalized, attention now turns to rehabilitating other vulnerable segments of the 6.25-mile pipeline to ensure long-term reliability and resilience. 

Map of construction area on Clara Barton Parkway near I495

DC Water will be doing construction as part of a sanitary sewer rehabilitation project on Clara Barton Parkway in Maryland from Sept 8 - Oct 10, 2025, which may cause delays inbound near the I-495 Beltway interchange. One lane will be closed in the work zone to reline an 800-foot section of the sewer line, known as the Potomac Inteceptor. Access to the inner and outer loops of the Beltway will remain available.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Canal Rd slope showing areas with fallen rock
DC Water to Begin Canal Road NW Slope Stabilization Project

Off-Peak Lane Closures and Sidewalk Closure Begin This Week

Starting, Saturday, September 20, DC Water will begin construction to stabilize the slope on Canal Road NW between Foxhall Road (Glover-Archbold Trailhead) and the Georgetown University (GU) entrance.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting
Date
September 18, 2025
Thursday, 9:30 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.