“Fix a Leak Week” is March 15-21

March 11, 2010

(Washington, DC) – Minor water leaks account for more than 1 trillion gallons of water wasted each year in American households. The District of Columbia Water and Sewer Authority (DC WASA) will remind its customers to improve their water efficiency by finding and fixing leaks during “Fix a Leak Week,” March 15-21, 2010. Fix a Leak Week is sponsored by the U.S. Environmental Protection Agency’s (EPA’s) WaterSense® program.

“In today’s economy, our customers want to save money on their bills. Fixing household leaks is a great way to save water and money too,” said DC WASA General Manager George S. Hawkins. “We’re excited about our first Fix a Leak Week because water is a life-giving resource that shouldn’t be wasted, and DC WASA is happy to help conserve it.”

On Monday, March 15, DC WASA will kick off Fix a Leak Week with a water- conservation event at the Frank W. Reeves Municipal Center, 2000 14th Street, NW. From 10:00 a.m. to 2:00 p.m., DC WASA representatives will distribute water-saving information and demonstrate how to install water-efficient plumbing fixtures. DC WASA’s Wayne the Waterdrop character will also make a special appearance.

During the week, consumers can visit our website, www.dcwasa.com, and Facebook page, www.facebook.com/dcwasa, for useful water-saving tips and to learn more about WaterSense labeled products. These products use about 20 percent less water and perform at least as well as standard models. Most common leaks can be eliminated by retrofitting homes with WaterSense labeled fixtures and other high-efficient appliances.

About The District of Columbia Water and Sewer Authority
The District of Columbia Water and Sewer Authority (DC WASA), is an industry leading multi-jurisdictional regional utility that provides drinking water, wastewater collection and treatment to more 600,000 residential, commercial and governmental customers in the District of Columbia, and also collects and treats wastewater for 1.6 million customers in Montgomery and Prince Georges counties in Maryland and Fairfax and Loudoun counties in Virginia. DC WASA’s service area covers approximately 725 square miles and the company operates the world’s largest advanced wastewater treatment plant with a capacity of 370 million gallons per day and has a peak capacity of 1.076 billion gallons per day.

###

Latest News

Worker on side of steep slope

TRAFFIC ADVISORY - CLEAN RIVERS - POTOMAC RIVER TUNNEL PROJECT

DC Water is in the final stretch of its slope stabilization project along Canal Road NW, a critical project that will pave the way for Potomac River Tunnel construction at this site. Beginning, the week of December 15, 2025, one westbound lane of Canal Road will be closed during daytime, off-peak hours on weekdays and Saturdays to hydroseed the slope.

Image of Wendy with EPA Letter

DC Water is reaching out to nearly 25,000 customers this month with important information about the material of their water service lines. These annual notifications are part of DC Water’s ongoing commitment to prevent exposure to lead and remove lead service lines from the District’s drinking water system through the Lead Free DC initiative.

Placeholder DC Water Image

Following the completion of priority valve repairs, DC Water will be doing road restoration work along New York Ave and Bladensburg Rd NE this weekend. The work will require lane closures for the duration of the weekend, reduce capacity, and may cause a significant impact to traffic.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Worker on side of steep slope
Canal Road Slope Stabilization Project Nears End; Off-peak Lane Closure to Replant Slope

TRAFFIC ADVISORY - CLEAN RIVERS - POTOMAC RIVER TUNNEL PROJECT

DC Water is in the final stretch of its slope stabilization project along Canal Road NW, a critical project that will pave the way for Potomac River Tunnel construction at this site. Beginning, the week of December 15, 2025, one westbound lane of Canal Road will be closed during daytime, off-peak hours on weekdays and Saturdays to hydroseed the slope.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.