SMALL DIAMETER WATER MAIN REPLACEMENT PROJECT CAPITOL HILL NEIGHBORHOOD III – ADVISORY NEIGHBORHOOD COMMISSION 6B

ADVISORY NEIGHBORHOOD COMMISSION 6B

Overview

As part of its Capital Improvement Program, DC Water is replacing existing 12-inch and smaller cast iron water mains in various locations throughout the city. Construction for this project will occur in the Capitol Hill neighborhood (see construction location map on the back). These efforts will help improve water quality and system reliability, increase water pressure in some areas, and maintain adequate flows throughout the system.

 

Scope of work

Installation of approximately 3,786 linear feet of 3-inch up to 12-inch water mainsReplacement of service lines – including free private side replacement of lead and galvanized iron pipeReplacement of fire hydrants and valvesRestoration of all surfaces disturbed by the project construction upon completion of work

 

Schedule

Construction start: On or about 08/09/2023Construction completion: On or about 03/15/2024Normal work hours: 7:00 AM to 5:00 PM, Monday through Friday

The contractor may, at times, need to work at night or on weekends, dependent upon certain construction activities or due to inclement weather.

 

Important information

For all planned temporary water service shut-offs, affected residents will be notified 48 hours in advance. Service interruptions should be minimal.Construction activities such as these may cause temporary discolored water or low water pressure. If you experience discolored water, it is recommended that you flush your cold water tap from the lowest point inside your property for approximately 15 minutes. If your water does not clear after this process, please contact DC Water’s Water Quality and Technology Division, or our 24-hr Emergency/Command Center.

Traffic

Flagging operations and lane closures may be required daily for each construction phase to maintain traffic in the construction work zone. All Traffic Control Plans will be approved by the District Department of Transportation (DDOT). At various times during construction, “No Parking” signs may be placed in certain areas in and around the work zone.  Notifications regarding “No Parking” zones will be posted 72 hours prior to construction, as required by DDOT.

Partners

DC Water is currently working closely with DDOT to ensure minimal traffic disruptions during this project. Regular updates will also be provided to impacted residents, Advisory Neighborhood Commission 6B, Ward 6 representatives in the Mayor’s Office of Community Relations and Services, and Ward 6 Councilmember Charles Allen and members of his staff.


 

Contact Information

For more information, please contact
DC Water Project Manager:  Christopher Peake (443) 504-5501 / christopher.peake@dcwater.com

DC Water Project Contractor: Capitol Paving of D.C. Inc. - Raquel Flores (202) 271-4131

DC Water Water Quality and Technology Division: (202) 612-3440

DC Water 24-hr Emergency/Command Center: (202) 612-3400

DC Water Office of Marketing and Communications: (202) 787-2200