Laetitia Mulamula

Laetitia Mulamula

Laetitia is a program manager with 19 years of experience in program and project management; planning; design; and construction of civil engineering projects mainly in water and wastewater infrastructure including treatment and conveyance systems. She has overseen a $12.1B smart city development program that includes master planning, design and implementation of water, wastewater, energy, and transportation infrastructure.  Laetitia previously spent more than seven years working with DC Water through Wastewater Treatment Program Manager (WTPM) contracts. In her present role with AECOM, she will be the program manager for DC Water’s WTPM II. This program consists of a $1B 10-year capital improvement plan for the Blue Plains AWTP. She brings valuable experience managing multicultural and virtual teams on infrastructure and urban development projects and a practical, collaborative, and stakeholder-focused perspective to program management.

She holds a Master of Science in chemical engineering degree from Howard University’s School of Engineering and is a licensed professional engineer.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Worker on side of steep slope
Canal Road Slope Stabilization Project Nears End; Off-peak Lane Closure to Replant Slope

TRAFFIC ADVISORY - CLEAN RIVERS - POTOMAC RIVER TUNNEL PROJECT

DC Water is in the final stretch of its slope stabilization project along Canal Road NW, a critical project that will pave the way for Potomac River Tunnel construction at this site. Beginning, the week of December 15, 2025, one westbound lane of Canal Road will be closed during daytime, off-peak hours on weekdays and Saturdays to hydroseed the slope.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.