UPDATE: DC Water Restoring Water Service to Impacted Customers in Northeast DC

December 03, 2024

DC Water crews have been working diligently since the overnight hours to restore water service to customers in Northeast DC experiencing low or no water pressure. As we continue efforts to repair the leak suspected of causing the pressure drop, we have been able to temporarily reroute water through a different transmission main to service these customers. At this time, the water is being recharged, and we are slowly increasing the pressure to homes and businesses in this area.

Additionally, we have isolated a water main believed to be the primary source of the leak and will continue working throughout the night to make repairs.

In the meantime, the boil water advisory issued earlier today remains in effect, pending additional testing to confirm the water quality meets EPA standards.

The impacted neighborhoods include River Terrace, Mayfair, Eastland Gardens, Kenilworth, Deanwood, Central Northeast, and Anacostia Park.

DC Water advises customers to search their address on the interactive map at dcwater.com or call the 24-Hour Command Center at (202) 612-3400 to determine if they are in the impact area of this advisory. Customers in the impacted area should boil water used for drinking and cooking. Customers outside this area can continue normal water use.

Customers in the impact area should follow this guidance at this time:

•    Discard any beverages and ice made after midnight on Tuesday, December 3, 2024.
•    Run cold water until clear (if discolored) prior to boiling.
•    Run cold water for 2 minutes if known sources of lead are present prior to boiling.
•    Bring water to a rolling boil for 1 minute and let it cool.
•    Store cooled water in a clean, covered container.

Cooled, boiled water or bottled water should be used for:

•    Drinking
•    Brushing teeth
•    Preparing and cooking food
•    Washing fruits and vegetables
•    Preparing infant formula
•    Making ice 
•    Washing dishes by hand
•    Giving water to pets

*Do not use home filtering devices without boiling the water.

Customers with questions can contact DC Water Customer Service at (202) 354-3600 (Monday-Friday, 8 a.m. to 5 p.m.) or the 24-Hour Command Center at 202-612-3400. Information is also available at www.dcwater.com and Bilingual FAQs are provided at www.dcwater.com/boilwaterFAQ.

Este aviso y más información están también disponibles en www.dcwater.com y preguntas frecuentes bilingües se encuentran en www.dcwater.com/boilwaterFAQ.

Latest News

Photo of completed repair with concrete encasing the sewr pipe

DC Water has successfully completed emergency repairs on a critical section of the Anacostia Force Main following a failure near Anacostia Avenue and Ponds Street Northeast in July. With repairs finalized, attention now turns to rehabilitating other vulnerable segments of the 6.25-mile pipeline to ensure long-term reliability and resilience. 

Map of construction area on Clara Barton Parkway near I495

DC Water will be doing construction as part of a sanitary sewer rehabilitation project on Clara Barton Parkway in Maryland from Sept 8 - Oct 10, 2025, which may cause delays inbound near the I-495 Beltway interchange. One lane will be closed in the work zone to reline an 800-foot section of the sewer line, known as the Potomac Inteceptor. Access to the inner and outer loops of the Beltway will remain available.

Rock Creek Trail Site for Potomac River Tunnel Project

Starting the week of August 25, DC Water will take another big step forward in the Potomac River Tunnel Project. Ground stabilization will begin at the Rock Creek Trail site, near the Watergate Complex, to drill secant piles that will form a retaining wall for the drop shaft.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Rock Creek Trail Site for Potomac River Tunnel Project
Ground Stabilization Work Begins Near Watergate Complex, starting Aug 25

Starting the week of August 25, DC Water will take another big step forward in the Potomac River Tunnel Project. Ground stabilization will begin at the Rock Creek Trail site, near the Watergate Complex, to drill secant piles that will form a retaining wall for the drop shaft.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting
Date
September 18, 2025
Thursday, 9:30 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.