Wastewater Flows From as far as Dulles Airport to Blue Plains

DC Water's wastewater collection system consists of the following:

  • Approximately 1,800 miles of sanitary and combined sewers
  • 16 stormwater stations
  • 75,000 catch basins and manholes
  • 22 flow-metering stations
  • 9 wastewater pumping stations

While most of the sewer system contains separate sanitary and storm sewers, combined sewers carrying both sanitary flow and stormwater drainage are prevalent in the downtown area and in older portions of the District. Combined sewer overflows (CSOs) occur during certain storm events when the combined sewer system contains too much flow and the mixture of wastewater and stormwater overflows into local waterways. There are presently 53 CSO outfalls listed in the DC Water’s National Pollutant Discharge Elimination System (NPDES) Permit.

The current CSO Abatement Program combines projects to maximize storage and minimize overflows to receiving waters. The program consists of inflatable dams, dynamically controlled weirs, outfall gates and other flow regulating devices, sewer separations and a swirl treatment facility. The Northeast Boundary Swirl Facility provides preliminary treatment including disinfection and some solids removal for combined sewage overflows prior to discharge during wet weather. The DC Clean Rivers program will further control CSOs.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Section of Tunnel Boring Machine Mary being prepared for excavation to begin
Media Advisory: DC Water to Hold Ceremonial Blessing for Tunnel Boring Machine "Mary," Signaling Start of Digging for Potomac River Tunnel Project

DC Water CEO and General Manager David L. Gadis will be joined by DC Mayor Muriel Bowser, DC Water Board Chair Dr. Unique N. Morris-Hughes, and other District leaders, for the ceremonial blessing of "Mary," the massive tunnel boring machine (TBM) that will soon begin her underground journey to build part of the Potomac River Tunnel. The event, November 3, marks a major milestone on the project which will dramatically reduce combined sewer overflows and improve water quality in the District.

Latest Blog Post
A helicopter lowers a drill rig to workers on the Potomac River.
DC Water begins drilling in Potomac River to explore options to rehab underwater sewer line
When one of your major sewer lines runs through the Potomac River, a backhoe and trencher won't do. That's why we've got helicopters carrying a 14-ton drill and workers suspended midair over the Potomac.
Upcoming Meeting
Date
November 6, 2025
Thursday, 9:30 AM

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 40% of the last 3 payments made and in the new fiscal year 50% will be credited. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.