EMERGENCY WATER OUTAGE
Nov 22, 2026 | 03:53 PM

EMERGENCY WATER OUTAGE
Nov 22, 2026 | 06:00 AM

Placed End to End, Our Sewer Pipes Would Stretch from DC to Utah

Sanitary Sewer Pipes

DC Water's sanitary sewer system includes over 1800 miles of pipes- large interceptor sewers, smaller gravity collection sewers, sewer lateral connections and the 50-mile Potomac Interceptor System which carries wastewater from areas in Virginia and Maryland to Blue Plains.

The existing sewer system in the District dates back to 1810, and includes a variety of materials such as brick and concrete, vitrified clay, reinforced concrete, ductile iron, plastic, steel, brick, cast iron, cast-in-place concrete and even fiberglass.

Pumping Stations

The sewer system is intended to work by gravity, which means it is designed so that wastewater flows downhill from the source to the treatment plant. Sometimes, the shape of the land makes it necessary to lift the water from a low point to a higher point using electric pumps. From there, gravity can again take over and continue the flow toward the plant. DC Water also has storm pumping stations that collect rainwater from roadways and surrounding drainage areas and convey flow to the nearest river or stream.

DC Water has sixteen storm pumping stations and nine sanitary and combined sewer pumping stations and one swirl facility. These pumping stations keep wastewater flowing to the treatment plant and prevent overflows in buildings, streets and waterways. Storm pumping stations prevent street flooding during times of heavy rain.

O Street Pumping Station
 

Main Pumping Station

The eight sewer pumping stations are:

  •  Main Pumping Station
  •  O Street Pumping Station
  •  Potomac Pumping Station
  •  East Side Pumping Station
  •  Rock Creek Pumping Station
  •  Upper Anacostia Pumping Station
  •  Poplar Point Pumping Station
  •  Earl Place Pumping Station
  •  3rd & Const. Pumping Station

 

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Announcement

Photo of Piney Branch Tunnel site, including the outfall where combined stormwater and wastewater overflows are released in heavy rains
TRAFFIC ADVISORY: Temporary Road Closure for Equipment Delivery May cause delays on Park Road NW

On November 17, drivers may experience delays along Klingle Road and Park Road NW around midday 10 a.m.

Latest Blog Post
Before-and-after comparison of a 12-inch blowoff connected to a 36-inch water main near Massachusetts Avenue and Macomb Street NW. The images show the inside of the structure before the repair, repair work around the pipe, and the interior after the repair was completed.
One Repair, Millions of Gallons Saved
How Teamwork Helped DC Water Stop Hidden Water Loss
Upcoming Meeting

Upcoming Events

Customer Service Center Announcement

Payment Plan Incentive: provides a credit back of 50% of the last 3 payments made. Eligible participants are residential customers who have had an outstanding balance for 60 days or greater and with an outstanding balance of $500 or more.