EMERGECY WATER OUTAGE
Apr 17, 2024 | 12:30 PM

Gresham Place NW Road Closure Begins On or About November 23

November 17, 2015

DC Water will be performing construction activities on Gresham Place, NW as part of its ongoing program to inspect, evaluate and rehabilitate the District’s sewer systems infrastructure.

Beginning on Monday, November 23, 2015 through Wednesday, November 25, 2015, weather permitting, crews will be working on Gresham Place between 5th Street, NW and Georgia Avenue, NW. Specifically, they will be using manholes in this portion of the roadway to access the sewer main and conduct inspection and cleaning of the main to determine if further maintenance or repairs are needed. Normal work hours will be from 9:30am to 3:30pm, Monday through Friday.

Important Information:
* Gresham Place, NW between 5th Street, NW and Georgia Avenue, NW will be closed to through traffic during normal work hours; this portion of the roadway will be open to local traffic only.
* Detour traffic signs, traffic control and protective barriers will be set up to maintain public safety and alert motorists of the upcoming road closure and traffic changes.
* Some traffic stops and delays within the vicinity of the project area are anticipated.
* Street parking will also be restricted within the project area during normal work hours. Accordingly, “No Parking” signs will be posted 72 hours prior to the work, as required by the District Department of Transportation.
* Pedestrian access will be maintained throughout this portion of work.
* During normal work hours, Columbia Road, NW may be used as an alternative route for westbound travel.

###

About DC Water
The District of Columbia Water and Sewer Authority (DC Water), is an industry leading multi-jurisdictional regional utility that provides drinking water, wastewater collection and treatment to 600,000 residential, commercial and governmental customers in the District of Columbia, 17.8 million annual visitors and also collects and treats wastewater for 1.6 million customers in Montgomery and Prince Georges counties in Maryland and Fairfax and Loudoun counties in Virginia.

DC Water’s service area covers approximately 725 square miles and the company operates the world’s largest advanced wastewater treatment plant with a capacity of 370 million gallons per day and a peak capacity of 1.076 billion gallons per day.

Latest News

Placeholder DC Water Image

(Washington, DC) –DC Water’s contractor on the Potomac River Tunnel Project will continue potholing operations along Independence Avenue, SW between Ohio Drive and West Basin Drive on or about April ...

Photo of CEO David Gadis and Chief Communications and Stakeholder Engagement Officer Kirsten Williams addressing the audience at a town hall meeting.

Authority Offers Virtual and In-Person Options

Photo shows an adult washing a glass in the sink with the faucet running.

The U.S. Army Corps of Engineers’ Washington Aqueduct, which supplies water to DC Water, annually performs a temporary disinfectant switch from chloramine to chlorine. This year, the switch runs from March 25 to May 6. During that time, customers may notice temporary minor changes in taste and odor.

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Latest Blog Post
Leveraging Green Infrastructure for the Triple Bottom Line
Leveraging Green Infrastructure for the Triple Bottom Line
Leveraging Green Infrastructure for the Triple Bottom Line
Upcoming Meeting
Date
April 18, 2024
Time
Thursday, 1:30 PM