Sewer Rehabilitation Project - Glover-Archbold Park

Glover Archibold3.jpg

OVERVIEW

DC Water is performing sewer rehabilitation projects throughout the city as part of its Capital Improvement Program (CIP). The proposed Glover-Archbold Park Sewer Rehabilitation project would involve the rehabilitation of sanitary sewer from Van Ness Street, NW to Canal Road, NW. The benefits of this project would include the rehabilitation of an aging sanitary sewer system, improved structural integrity while maintaining adequate hydraulic capacity, and the reduction of stream and groundwater infiltration and potential sanitary sewer overflows.

SCOPE OF WORK 

  • Rehabilitation of approximately 20,400 linear feet of sanitary sewer pipe within the project area
  • Rehabilitation of sixty-seven manholes
  • Asset protection
  • Rehabilitation of two Municipal Separate Storm Sewer System (MS4) outlets and one extended

SCHEDULE 

  • Draft Environmental Assessment (EA) Submitted to National Park Service (NPS) for review, summer 2016
  • Draft Environmental Assessment (EA): Submitted to National Park Service (NPS) for review on January 30, 2017
  • Draft EA is currently being reviewed by the NPS
  • NPS and DC Water completed site visits to discuss SOF, March and November 2017
  • Pump Station design was considered but dismissed as an alternative, March 2018
  • NPS and DC Water conducted a preliminary vegetation walkthrough, Fall 2018
  • NPS and DC Water conducted a site visit to look at stream geomorphology, Fall 2019
  • Construction start date est. Winter 2026
  • Construction complete date est. Summer 2028

IMPORTANT INFORMATION

DC Water is working in cooperation with the NPS, which is the lead agency, to prepare an Environmental Assessment (EA) for the Glover-Archbold Park Sewer Rehabilitation Project as required by the National Environmental Policy Act (NEPA). NEPA regulations mandate that a review period is completed once the EA is made available to the public. At that time stakeholders such as Advisory Neighborhood Commissions and the public will be notified.

PROJECT LOCATION

Contact Information

FOR MORE INFORMATION, PLEASE CONTACT:

DC Water Project Manager: Peter Kelley
(202) 787-2540
Email: louis.arguello@dcwater.com

DC Water 24-hr Emergency:
(202) 612-3400

DC Water Office of External Affairs:
(202) 787-2200

 

Upcoming Meeting

Board of Directors Meeting

April 24, 2023

Monday 9:00 AM

Latest Blog Post
Leveraging Green Infrastructure for the Triple Bottom Line
Leveraging Green Infrastructure for the Triple Bottom Line
Leveraging Green Infrastructure for the Triple Bottom Line
Upcoming Meeting
Date
April 23, 2024
Time
Tuesday, 1:30 PM