Spring Place Water and Sewer Rehabilitation Project

As part of its Capital Improvement Program, DC Water is performing water and sewer rehabilitation projects throughout the city. This project involves the rehabilitation of water and sewer infrastructure located on Spring Place NW and Spring Road NW, between 14th and 16th Streets.

Download a more detailed project information sheet on Spring Place Water and Sewer Rehabilitation Project (PDF 317 kb) .

Scope of Work

This rehabilitation project will be performed in four phases. These are as follows:

  • Phase 1 - Assessment of the current condition of the sewer and manholes by performing a walk-through of the pipe and using a truck-mounted closed-circuit television camera and supporting equipment to inspect and clean the sewer and manholes.
  • Phase 2 - Evaluation and verification of inspection and other data.
  • Phase 3 - Design of rehabilitation plan for water and sewer infrastructure based upon data evaluation.
  • Phase 4 - Construction of rehabilitation design to prolong the life of the water and sewer infrastructure.

Project Schedule

Field investigations and design activities for this project will take place from Summer 2012 until Winter of 2013. At the completion of those activities construction for this project will begin Spring 2014 until Winter 2015.