Fee Schedule

Retail Customer Fees and Charges

Customer Bad Check Fee$25
Declined Credit Card Fee$35
Customer Penalty Late Fee10%
Additional Late Fee*+1% per month of Balance Due
Turn On$50
Customer Turn Off Charges for Non-Payment$50
Broken By-Pass Seal$700
Unauthorized Turn On$245
Second Water Audit within 24 months$125

*Compounded monthly on bills not paid for more than sixty (60) days.

Water Taps and Connections

Installation

1 Inch Tap$325
1 1/2 Inch Tap$380
2 Inch Tap$415
Water ConnectionReimbursable

Removal

Water Tap$310
Water Connection$610

**Contractors are responsible for excavation, backfilling, and repaving.

Sewer Taps**

Pointing Up Sewer Taps$660
Insertion of Y-Branch$235
Sewer Tap Removal$235

**Contractors are responsible for excavation, backfilling, and repaving.

Meter Purchase and Installation

SizePrice of MeterLabor Cost
5/8 Inch$25$241
3/4 Inch$99$241
1 Inch$128$241
1 1/2 Inch$298$246
2 Inch$342$246
3 Inch$918r$627
4 Inch$1,010$698
6 Inch$1,262$698
8 Inch$1,400$1,192
10 InchN/A$1,252

Fire Hydrant Charges

Fire Hydrant Flow Test (No Recent Record Available)$225
Fire Hydrant Flow Test (Recent Test Record Available)$25
Fire Hydrant Use per dayUsage Based

Water Bubbler Install and Removal

(Temporary Drinking Fountain Connected to a Fire Hydrant)

1 Water Bubbler$262
Each Additional Water Bubbler after the first$54

Engineering Reviews, Sale of Documents, Maps and Manuals

Engineering Reviews

Large Project Permit Review Fees (public main greater than 2 inches)
Availability Letter (Large Commercial)$500
Large Permits Fast Track (15 working days review per submission)$10,000
Large Permit Basic$7,500
Large Permits Submissions (Excessive Submission: 4 or more)$1,000
Foundation to Grade - Large Commercial$1,000
Approved Project Plan Revision (Project Scope/Design Change) $1,000
Approved Plan Revision (Field Conditions) $250
Large Project Sheeting and Shoring (Large Commercial)$1,000
Raze Permits$150
Abandonment Waiver Request$500
Small Project Permit Review Fees (public main less than 2 inches)
Availability Letter (Small)$125
Small Residential$300
New Home from a Large Project Subdivision (10 or more units)$150
Small Commercial (multi-family, apartments, store, etc)$2,500
Small Sheet and Shore$500

Sale of Manuals

Design Manuals - Initial$60
Design Manuals - Revisions/Updates$25
Construction Standard Details - Initial$35
Construction Standard Details - Revisions/Updates$10
Construction General Conditions & Standard Specifications - Initial$25
Construction General Conditions & Standard Specifications - Revisions/Updates$5
DCWater Pipeline Design Manual - Initial$75
DCWater Pipeline Design Manual - Revisions/Updates$30
Preparing As-Built Drawings$215

Maps

Electronic Version of Water/Sewer Counter and As-Built Maps - Per Project$100
Updates of the Electronic Version - Per Project$25

Pre-Treatment

Waste Hauling - Annual Fee Per Vehicle

Vehicles 0-49 gallons$160
Vehicles 50-799 gallons$2,265
Vehicles 800-1,499 gallons$6,170
Vehicles 1,500 gallons or more$14,640

Legal Charges

Witness FeeSalary + Fringes

Copying Charges

Maps and Technical Documents (Charge Per Sheet)

Xerographic$2.50
Vellum$4.00
Mylar$5.50

Standard Photocopying (Charge Per Sheet)

Standard Letter and Legal Pages***$0.25

***For legal size (8 1/2" x 14") and letter size (8 1/2" x 11") paper.

My DC Water Login

  • Pay bills
  • Update Account
  • View consumption
  • View your Clean Rivers IAC

MORE INFO >

Create Login | Forgot Password?

Report a Problem

Consumer Services & Outreach

My DC Water Login

MORE INFO >

Create Login | Forgot Password?

Report a Problem